Annual Maintenance Contract (AMC) for Conveyor Systems
HOME > Annual Maintenance Contract (AMC) for Conveyor Systems
The objective of Annual Maintenance Contract (AMC) is to ensure efficient, safe, and uninterrupted operation of the conveyor systems installed at Client Premises by carrying out scheduled preventive maintenance and prompt breakdown support, thereby reducing downtime and extending equipment life.
Equipment Covered
This AMC shall cover all conveyor systems installed at the client’s facility, including but not limited to:
Belt conveyors
Roller conveyors
Chain conveyors
Associated drive units, motors, gearboxes
Pulleys, rollers, idlers, bearings, couplings
Conveyor supporting structures and guards
Preventive Maintenance Services
Preventive maintenance shall be carried out as per the agreed schedule (monthly / quarterly / as required) and shall include:
Visual inspection of conveyor structure, alignment, and condition
Inspection of belts, chains, rollers, idlers, and pulleys for wear and damage
Belt tracking, tensioning, and alignment correction
Lubrication of bearings, chains, gearboxes, and other moving parts
Inspection of motors, gearboxes, couplings, and drive assemblies
Tightening of fasteners, mountings, and supports
Cleaning of conveyor components and working areas
Inspection and verification of safety guards and emergency stop systems
Breakdown Maintenance Services
Attending breakdown calls during agreed working hours (or 24×7 if specified)
Fault diagnosis and corrective maintenance of conveyor systems
Rectification of mechanical and operational issues
Restoration of conveyor operation in the minimum possible time
Recommendation for repair or replacement of failed components
Electrical & Instrumentation Support (If Applicable)
Inspection of conveyor motors, wiring, sensors, and limit switches
Checking of control panels, starters, and VFDs
Functional testing of interlocks and emergency stop circuits
Spares & Consumables
Supply of spare parts shall be chargeable, unless otherwise specified under a comprehensive AMC
Contractor shall recommend critical spares to be maintained on-site
Replacement of consumables such as belts, chains, rollers, bearings, and lubricants based on actual condition and approval
Manpower Deployment
Deployment of trained and skilled maintenance technicians for scheduled visits
Supervisor or service engineer support as and when required
Documentation & Reporting
Preventive maintenance checklist for each service visit
Breakdown maintenance reports with details of faults and actions taken
Equipment health status report and improvement recommendations
Record of replaced and recommended spare parts
Exclusions
The following are excluded from the scope unless specifically agreed in writing:
Major overhauls, redesign, or system modifications
Capacity enhancement or relocation of conveyors
Structural fabrication or civil works
Damage due to misuse, accidents, fire, flood, or abnormal operating conditions
Power supply issues or external electrical faults
Safety & Compliance
All maintenance activities shall be carried out in compliance with Indore Petrocon Industries’ safety rules and statutory requirements
Use of appropriate Personal Protective Equipment (PPE) is mandatory
Contractor personnel shall follow all site safety and work permit procedures
Contract Duration
AMC duration: 12 months or as per Client Requirement
Contract may be renewed upon mutual agreement